Committed base
Founder and PÛR field-work funding.
WATER SYSTEM RESTORATION
FIELDWATER repairs failed community water systems, documents what the work costs, and follows up after the fix.
Get the opening notice while public giving remains closed.
TIGRAY, ETHIOPIA · CONTEXT PHOTO · NOT A FIELDWATER PROJECT
WHAT SUPPORT IS BUILT TO FUND
Assess the existing system, the people it serves, and what stopped working.
Fund parts, transport, testing, and qualified specialist work matched to the problem.
Report the scope, actual costs, completed work, testing evidence, and follow-up.
THE FIRST FIELD INITIATIVE
FIELDWATER’s first initiative starts with a $25,000 founder and PÛR field-work commitment. Assessed needs will determine the scope that future supporters can help fund.
The goal is to restore as much reliable water as the field budget can responsibly reach. That may mean one substantial repair or several systems and communities. No site has been selected and no completed result is claimed.
Read the full project recordHOW FAR THE FIRST INITIATIVE COULD GO
These are planning levels, not promised beneficiary counts. Final reach depends on assessed failures, repair costs, water safety, access, specialist needs, and the durability of each solution.
Founder and PÛR field-work funding.
Includes the $25,000 commitment; scope follows assessment.
A CLEAR DONOR CHOICE
Monthly support is designed to keep assessment, repairs, reporting, and follow-up moving.
Flexible support can fund active projects and the operations required to deliver and document them.
Choose an open project when one is available. Project-directed monthly terms will explain what happens when the funding need is met or the project closes.
No payment details are collected in the current preview.
THE RECORD DONORS SHOULD SEE
FIELDWATER plans to keep the original scope beside the final record so donors can see what changed. Results will separate verified facts from estimates, and unresolved problems will stay visible.
BEFORE YOU GIVE
Not yet. Project Zero has a $25,000 committed field-work minimum included in its $50,000 current total goal. Further assessed work may follow if that goal is met; FIELDWATER’s federal 501(c)(3) application remains pending and broad public fundraising has not opened. Follow Field Notes for the opening notice.
FIELDWATER does not currently represent gifts as tax-deductible. Federal status and final donation terms will be stated clearly before public fundraising opens.
FIELDWATER will explain project and operating costs openly. We do not make a “100% to projects” promise because assessment, responsible delivery, reporting, and follow-up are part of doing the work well.
Selection will begin with documented need and an understandable failure. FIELDWATER will also consider access, parts, qualified skills, testing, maintainability, local responsibilities, and realistic follow-up.
Restoration comes first. New infrastructure remains a limited option when rehabilitation cannot provide a safe, reliable solution.
MAKE WATER WORK.
Public fundraising is not open and no payment is accepted.